Wednesday, July 16, 2008

Fog Machines

Roscoe has an interesting bit on how fog machines work on their page. Their article can be seen at: http://www.rosco.com/uk/technotes/fog/how_mach_work.asp

Fake TV Light

Every year or so someone posts on stagecraft about how to do the effect of a TV onstage.

Recently an off the shelf answer has surfaced aimed at creating the effect for security reasons; to allude to a house being occupied while it may be empty. The object would be an LED flickering device. Check it out at: http://blog.makezine.com/archive/2008/05/faketv_flickering_led_dev.html

Fake Food

The following site was posted on the stagecraft mailing list:
The site will provide PDFs that you can print and a apply to a substrate to create fake food.
It would leave alot up to the skill of the props person applying the print to a substrate neatly and cleanly, but the coloration is very realistic.

Tuesday, July 15, 2008

Rigging Manual

Texas Scenic Company has a variety of information regarding rigging on their site - one of which is a counterweight rigging manual:
http://www.texasscenic.com/rigmanual.pdf

Sunday, July 13, 2008

Trends in Project Management

A question on Linkedin came up about current trends in the industry. One of the answers mentioned that training should come earlier, as opposed to being a University / College program.

I thought this was interesting – and true. Perhaps it stems from the root of the development of Project Management in construction and IT capacities, that it seems to be rigidly defined.

But if you look at what a project is - many everyday things that we do is a “project”. Teaching project management can help people manage planning a wedding, plan a vacation, manage the home buying process, to just about anything else. It’s a lot about how you frame the idea. A marriage isn’t a project (though I suppose someone could argue), but planning the wedding is. Why? You have a deadline, you have a concrete start (she said yes) to a concrete end (while you have to plan the cleanup / “strike”) of the wedding, the wedding has a concrete end. You have budgets, there are deadlines within the timeline to order materials, there is a variety of communication. There are even political aspects (the guest list!). At any rate, since the skills of a project manager are useful life skills – it would make sense to teach it in schools.

Friday, July 11, 2008

Toys

One of my pet projects is using toys to illustrate and improve technical theatre skills. Who doesn't like to learn and play at the same time. I use Legos when I teach drafting, and am working with Knex for rigging and automation prototyping. And I really like that you can now use them together. One of these days I will bit the bullet and buy some mindstorms...

Soon (hopefully releasing in dec 2008) is RoBlocks.
http://www.roblocks.org/
They are magnetic blocks that include actuators and sensors and such. Seems like a cool idea.

My general idea is to start to get into ways that automation can be taught in a hands-on manner without having to use pre-built unit (thus assembling and not inventing), and without taking load of time and money. I believe that with the way that robotics is advancing, that we should be able to start learning programming in the class-room to the extent that it will be used in a project, but in a scale that can be done as a lab.

Thursday, July 10, 2008

Plastics Information

I cam across this today as I was surfing looking for something new to learn:
http://blog.orselli.net/search/label/fabrication
http://www.tapplastics.com/info/video.php
Tap plastics has quite a few how-to videos on it's site - some of which are fairly useful!

Online collaboration

Nick Keenan wrote a blog on his site about writing a company bible (link provided below). I thought it was very well thought out and quite useful. I’ll admit that this sort of record keeping and process appeals to me in general. Nevertheless, there are a variety of good points in the blog.
-Distribution of information in a company is always a challenge. Each company creates a preferred working arrangement with preferred techniques. Speaking of scenery – some places only use 1x3, some use 1x4. While this is obvious by walking in a shop there are many subtle building techniques that often differ from one site to another. Where I work now “solves” that with a shop standards book, which is out of date, and only referred to when someone didn’t do it the “right” way. So with multiple project managers and multiple job leads, it sometimes feels like 6 or 7 different companies working under the same roof, all reinventing the same wheels.
-Updating information is another challenge. This requires commitment throughout the organization. I like the wiki idea, because behind the idea is that the information is not really final, just the current revision. The shop standards book here has an air that once completed it was “published and released”. Thus, it is a closed affair and will have a “cost” attached to revise. A company hopefully learns and grows through the corse of their work. Updating consistently allows this happen, and helps to further the growth. Allowing older information to stay through a forum can help newer people to the company get a hold on the history. Documenting successes are just as important as failures – you learn something from both results.
-I love the idea of an online community. Today, more than ever before we are an interconnected society, and communication takes on newer and more varied forms. I am also a fan of transparency. An online forum keeps the group as a whole in communication about all of the topics of the group, and thus can contribute on all of the topics, or at least be aware of the broader picture.
-I see a couple of drawbacks with the system. You have to be of an appropriate scale. If a company is too large, too much time will be spent maintaining the wiki and the forum, and not enough time producing, though I suppose the forum is also a metaphorical water cooler. Too little people in the company and the same thing happens – or there isn’t enough to keep the pieces together and it turns too social. Both scenarios are thoughts I have – and could stand to be corrected. I also would think that the larger the group the more the forum and wiki would tend to be run by fewer people – department heads and not carpenters, which starts increasing the gatekeeper issues discussed by Nick. Also, you have to have buy-in. Belonging in a group such as this would require a bit of work and learning. Entering into a group where it was a clearly established norm, would make new entry easier – but creating the system for a preexisting company may have some growing pains with getting participation.
-An additional comment I would have about writing a manual is that in addition to implementing or revising procedures as being the time to write and revise, I would say that someone new can help to revise. Why? Because they are learning everything for the first time and will often see more clearly the differences between the espoused method in the manual, and the working solution in action. They will also be very aware of questions and gaps where the information is limited.

At any rate, it was a good blog to read, and was full of advice that can be useful. Check it out at:
http://nikku.net/blog/how-and-why-to-write-a-company-bible/

Wednesday, July 9, 2008

Problem Solving

I thought the following link had an interesting article:
http://www.newsweek.com/id/71514/page/1
It reminded me of an article I read in grad school about firefighters. That article discussed how younger people tended to rely on balance sheet / algebra equations, and as more skill was gained, the choices shifted to a “gut feeling” decision. Experienced firefighters would come across a challenge, and would think through the first idea, and then the second, and so forth. The first idea they came to that worked out reasonably well through the current scenario was immediately put into action.

Theatre, of course, isn’t an emergency, despite what it occasionally feels like, and we don’t have the pressure of making decisions where lives are at stake. However, I often see different people approach the same challenge differently, and often arrive at a different solution based on the approach they take. I think that sometimes it is useful to fully think through several different options – building stud walls for platform legs work best in some situations, but not in others. Without reevaluating choices you may get into a groove where the choices are the most efficient for your time or budget, or for the good of the show. Yet, completely evaluating every choice would bog down the process to such an extent that nothing could progress. As with much in life – it is a fine line.

It’s also to think of when you have different factors to think of. There are many theatres where labor and the costs associated with labor don’t impact design or construction decisions. But the places where labor is involved with the rest of the budget can mean dynamically different approaches. Suddenly, it is cheaper to buy something than build it, or buy a different, more expensive material, because it saves labor. In the shop where I work now, the CNC machine is a great example. It saves a lot of time, but building set pieces is accomplished in a very different manor, and with different materials than standard construction.

Tuesday, July 8, 2008

High School Theatre Production

Check out this link for a variety of resources to help with high school theatre programs. The site includes a link to the Museum of Costume, an interactive theatre manual, and film resources as well.